Concrete Pumps Reach Record-Breaking Heights at Burj Khalifa

Jul 20, 2015  In April 2008, three trailer-mounted pumps reached the current world record for vertical concrete pumping. At the construction site of the Burj Khalifa, the world;s tallest building, concrete was pumped to a record height of 606 meters (m). A strategically designed concrete pumping system made the final conveying height a reality, as the concrete flowed through several stages up the 828

get price

Burj Khalifa Concrete Challenge Concrete Pump

Pumping trials Concrete pumping trials were conducted before the Burj Khalifa tower construction using a Putzmeister BSA 14000 HP-D stationary pump with a maximum hydraulic pressure of 310bar. A length of 600 m of highpressure ZX 125 delivery pipe was laid out horizontally with transducers to measure concrete pressure after pumping through ...

get price

Burj Khalifa -- Conquering the World's Tallest Building ...

May 12, 2010  Putzmeister's specially designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1,988 feet (606m) topping out Burj Khalifa, (previously known as Burj Dubai) the world's ...

get price

Burj Khalifa – a new high for high-performance concrete ...

May 25, 2015  Concrete pumping trials were conducted before the Burj Khalifa tower construction using a Putzmeister BSA 14000 HP-D stationary pump with a maximum hydraulic pressure of 310 bar. A length of 600 m of high-pressure ZX 125 delivery pipe was laid out horizontally with transducers to measure concrete pressure after pumping through distances of 250 ...

get price

Burj Khalifa, Dubai, United Arab Emirates - Putzmeister

Oct 30, 2019  Unimix first broke its own record with its BSA 14000 SHP-D trailer pump while working on Burj Khalifa in 2007 by reaching a pumping height of 1,483 ft. (452m). By 2008 they reached the current world record for vertical concrete pumping at a height of 1,988 ft. (606m).

get price

Burj Khalifa Concrete Challenge Concrete Pump

Pumping trials Concrete pumping trials were conducted before the Burj Khalifa tower construction using a Putzmeister BSA 14000 HP-D stationary pump with a maximum hydraulic pressure of 310bar. A length of 600 m of highpressure ZX 125 delivery pipe was laid out horizontally with transducers to measure concrete pressure after pumping through ...

get price

7 Challenges In Building The Burj Khalifa » Smart Architect

Concrete had to be pumped all the way up the Burj Khalifa, the building is cast in place and this created another set of challenges, how do you get the concrete to stay liquid when it’s pumped up the building, it had to be a special mix that could stay liquid when transported and then settle when poured in the molds, easier said than done ...

get price

(PDF) Burj Khalifa - A new high for high- Performance ...

The 828 m tall Burj Khalifa dominates the Dubai skyline and is the world's tallest structure by far – the first 586 m of the building is constructed from high-performance reinforced concrete ...

get price

World’s tallest building-to-be's got 99 problems, and ...

Mar 05, 2014  Gizmodo reports that they’ll be looking to the construction of Dubai’s Burj Khalifa (which at 2,722 feet is currently the world’s tallest structure). During the build, the crew’s high-tech concrete pumps were only able to be used at night due to steamy daytime temps fit for little but camels and cacti.

get price

SLIPER: Putzmeister’s concrete rheometer or the science ...

Nov 30, 2016  Concrete pumping has overcome huge technical challenges over the past recent years, not least breaking the world record in height pumping during the construction of the world’s tallest building in Dubai, the Burj Khalifa.

get price

Master Builders Solutions pushes the boundaries of ...

The challenge The Burj Khalifa now stands at over 800 m tall. To reach this world record the structure of the building had to comply with strict design and durability criteria. One unique challenge was ensuring the concrete mix design for the structural core of the tower was capable of being pumped to formidable heights. The structural core of the

get price

High Strength Concrete Concrete Elkem Silicon Products ...

World record vertical pumping height. The Burj Khalifa project set a world record for pumping concrete in November 2007. An 80 MPa concrete mix, containing Elkem Microsilica ®, was pumped from ground level to a vertical height of 601 metres. The high-strength pumped concrete was used to construct reinforced corewalls.

get price

..........................................................

Jan 05, 2010  One major challenge during construction was figuring out how to pump concrete to more extreme heights than ever before. On site, testing was carried out using horizontal pipelines to simulate the behavior of the concrete and predict the effects of pressure and friction on high-rise pumping. ... [Untitled Picture of Man at Top of Burj Khalifa ...

get price

The Burj Dubai Concrete Construction Magazine

Sep 04, 2007  Concrete placement for tall buildings also has taken great steps forward with recent developments in concrete pumps and placing booms. Putzmeister, Stuttgart, Germany (Sturtevant, Wis., in the United States), supplied the pump for the Burj, which moves concrete in

get price

A Look Through The Tallest Building in the World – The ...

Pumps Air handling units The Burj Khalifa uses a single-stack drainage system. Condensation Wind Water Temperature A Look Through The Tallest Building in the World – The Burj Khalifa A Look Through The Tallest Building in the World – The Burj Khalifa 1 bar = 14.5 pound-force per square inch Pipe guides and ball joints were

get price

Burj Khalifa — Conquering the World’s Tallest Building ...

May 13, 2010  Putzmeister’s specially designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1,988 feet (606m) topping out Burj Khalifa, (previously known as Burj Dubai) the world’s tallest building at 2,717 feet (828m) high, in the United Arab Emirates. “This extreme pump height was possible due to the trust and ...

get price

Burj Khalifa - Wikipedia

13 May 2007: Sets record for vertical concrete pumping on any building at 452 m (1,483 ft), surpassing the 449.2 m (1,474 ft) to which concrete was pumped during the construction of Taipei 101, while Burj Khalifa reached the 130th floor.

get price

(PPT) Burj Jaineet Mandot - Academia

Concrete 2. Steel •. Over 30,000 tons of steel were used •. About 250,000 m3 concrete was also used •. The reinforced concrete acts as the backbone of the whole structure. •. The pump needs 630HP to pump about 25000 tons of concrete •. It had took about 14mints for reaching the concrete to

get price

Stationary concrete pumps

concrete pumps are more than equal to the task. After all, back in 1977 during the construction ... during construction of the Burj Khalifa, the high-est building in the world, concrete pumps from ... high-strength concrete represent a huge challenge. A task that the BSA 1409 D overcomes with flying colours. With a

get price

World’s tallest building-to-be's got 99 problems, and ...

Mar 05, 2014  Gizmodo reports that they’ll be looking to the construction of Dubai’s Burj Khalifa (which at 2,722 feet is currently the world’s tallest structure). During the build, the crew’s high-tech concrete pumps were only able to be used at night due to steamy daytime temps fit for little but camels and cacti.

get price

Burj Khalifa — Conquering the World’s Tallest Building ...

May 13, 2010  Putzmeister’s specially designed BSA 14000 SHP-D reached a world record vertical concrete pumping height of 1,988 feet (606m) topping out Burj Khalifa, (previously known as Burj Dubai) the world’s tallest building at 2,717 feet (828m) high, in the United Arab Emirates. “This extreme pump height was possible due to the trust and ...

get price

7 Challenges In Building The Burj Khalifa » Smart Architect

Concrete had to be pumped all the way up the Burj Khalifa, the building is cast in place and this created another set of challenges, how do you get the concrete to stay liquid when it’s pumped up the building, it had to be a special mix that could stay liquid when transported and then settle when poured in the molds, easier said than done ...

get price

Construction of Burj Khalifa - World Tallest Building My ...

May 11, 2021  The high-performance concrete used in Burj Khalifa guarantees low permeability and higher durability. The C80 and C60 cube strength concrete is used incorporating fly ash, Portland cement, and the local aggregates. A young’s modulus of 43800N/mm 2 is said to be granted by the C80 concrete. The largest concrete pumps in the world were used to ...

get price

Constructing Burj Khalifa Civil Engineering Society, NIT ...

Aug 02, 2012  The previous record for pumping concrete on any project was set during the extension of the Riva del Garda Hydroelectric Power Plant in Italy in 1994, when concrete was pumped to a height of 532 m. Burj Khalifa exceeded this height on 19 August 2007, and as of May 2008 concrete was pumped to a delivery height of 606 m, the 156th floor.

get price

(PDF) The Challenges in Designing the World's Tallest ...

FIGURE 14 – Concrete Pumping System Test . ... In 2010, the Burj Khalifa claimed the title at 828 m, ... [Show full abstract] eclipsing Taipei 101 by more than 60 percent. With its innovative ...

get price

Burj Khalifa a new high for high- performance concrete

The 828 m tall Burj Khalifa dominates the Dubai skyline and is the world s tallest structure by far the first 586 m of the building is constructed from high-performance reinforced concrete (www ...

get price

(PPT) Burj Jaineet Mandot - Academia

Concrete 2. Steel •. Over 30,000 tons of steel were used •. About 250,000 m3 concrete was also used •. The reinforced concrete acts as the backbone of the whole structure. •. The pump needs 630HP to pump about 25000 tons of concrete •. It had took about 14mints for reaching the concrete to

get price

Burj Khalifa Construction Struggling from hardships to ...

Feb 15, 2021  Burj Khalifa Construction challenges. Challenge no.1 – Undesigned Structure: Challenge no.2 – Present soil is not appropriate for a skyscraper: Challenge no.3 – buttress core structure: Challenge no.4 – Concrete suction system: Challenge no.5 – bold crane operators: Challenge no.6 – installation of glass panels:

get price

Challenges Innovations - Burj Khalifa

Apr 30, 2012  Burj Khalifa stands a whopping 2,723 feet in the air making it the tallest building in the world. However, this was not accomplished without overcoming several major engineering design obstacles. In order to design such a complex and outstanding structure, many records in physical accomplishments and innovations had to be shattered.

get price

Stationary concrete pumps

concrete pumps are more than equal to the task. After all, back in 1977 during the construction ... during construction of the Burj Khalifa, the high-est building in the world, concrete pumps from ... high-strength concrete represent a huge challenge. A task that the BSA 1409 D overcomes with flying colours. With a

get price

World Record Breaking Concrete Structures

nearly 170,000m3 of concrete designed with a compressive strength 80N/mm2. MasterGlenium high range water reducing admixtures were able to meet this challenge making it possible to pump the concrete, without any interruption, to a height of up to 600 meters. The Burj Khalifa has redefined what is possible in the design and engineering of supertall

get price

Burj Khalifa, The Shard, and Rivals

to pump up the concrete to the top floors at a pressure of over 80 MPa [3]. Along its length, the pipe had several 180 degree bends to imitate the loss of pressure [15]. Consequently, Burj Khalifa broke the world record for vertical concrete pumping [3]. The mixed-use purpose of the Shard led to the unusual application of the materials

get price

The Burj Dubai Concrete Construction Magazine

Feb 01, 2008  The Burj Dubai—meaning “The Tower of Dubai” in Arabic—is now the tallest building in the world and it's still rising. At the time of publication, the building's height has reached 1921 feet (totaling 156 floors), making it 251-feet taller than the Taipei 101 building in Taipei, Taiwan, the previous tallest building. Concrete Construction takes a closer look at this modern marvel.